|
|
|

This
plant utilizes the Bulk Loading Fuel System with the following specifications:
- 2 Double sided top
loading bulk racks with 4 loading positions each, plus one single position
rack, all with RDR Bulk ATC Registers
- 2 PetroVend System
II Fuel Island Terminals
- Tank Gauge Option -
incorporates 12 Above ground storage tanks with Manual Entry plus Inventory
Reconciliation
- 1 PFA Master Control
Unit integrating registers, rack control, PetroVend System and manual
tank gauging into one Bulk Plant Control Unit
- Bill of Lading Document
Printing utilizing custom Ultramar form
- Windows Site Monitoring
& Reporting Software including Graphical Tank Display
|
|
|